1
/
of
2
DIXIETREE
6M Extra Long Lead Length 5V 2A Mains AC-DC Adaptor Power Supply 4mmx1.7mm 4x1.7
6M Extra Long Lead Length 5V 2A Mains AC-DC Adaptor Power Supply 4mmx1.7mm 4x1.7
Regular price
£17.99 GBP
Regular price
Sale price
£17.99 GBP
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Couldn't load pickup availability
This item is exactly as shown in the photos.
You will get a 5V 2A AC-DC Switching Adaptor Power Supply with a 1.1M Cable and 4mm x 1.7mm Male Connector.
Also, included is a 5M 4mm x 1.7mm Socket to 4mm x 1.7mm Male DC Connector Lead.
Both of these pushed together make 6M Length.
We post items 1st Class on the Same Day that Payment is Made (2pm Deadline).
We are Based in Leicester where we have a Customer Service Phone Line and Collection Desk open 9am-4pm Monday - Friday.
We provide VAT Invoices on request.
We offer 1 Year Warranty on all AC Adaptors.
Share
